A model of the dipole magnets that will be used in the LHC accelerator (under construction, will be ready for operation in 2007). In LHC will the two beams of primary particles go in separate beam pipes, to the left and right in the picture. This is contrast to for example LEP where both beams travels in the same beam pipe.